Friday, 7 October 2016

Ilyushin IL-102 build progress, and the final PSSA meet

A bit more triangular section into the fuselage, and a bit of reinforcement in the nose around the wood join :



The some thick planking :



I think the cockpit area might be too bulky...I will check that against some pictures soon, and modify if necessary.

The start of the engine pods :


I'll hot-wire this to shape, then plank them in 1/16th balsa.

This weekend is meant to be the final Orme visit with the PSSA, but as time goes on, the forecast gets worse.  It looks a lot better in south Wales, so I think I am talking myself into staying more local and hitting the VR98 slope instead on Saturday and Sunday.


No comments:

Post a Comment