Tuesday, 4 April 2017

PSS fleet preparation, April 2017

Well, here is a post with a bit of everything on it, with random pictures from my phone from this week so far.

Fouga nose-light testing - I had to drop the 6.6v from the LiFe to 6v max with a regulator as apparently the LED unit has a max voltage at that value.  All programmed up now!


The mini A4 has been re-servo'ed, and also set up on the Horus.

A bit of surgery for the A4 - tail incidence change.  This has now been blocked out with balsa and re-covered.


Fouga out in the sun after her satin lacquer top coat.


The little fatty!  She took about 5 ounces of lead in the nose to balance.


All pile on the scales.


Fouga detail shot.


U2 on the c-of-g rig.  Balanced between 5 and 8% stability.

Belly shot.  I've taped up the retract doors for now, as the maiden will be without it.
 


Looking forward to some flying this weekend.

No comments:

Post a Comment