Some progress on the new A10 tail. Once two sheets of 3/32nd have been joined, I can start drawing out servo positions (brought over from the old elevators) and a general rib layout :
Dry fit of ribs, hard 1/4" balsa TE glued on :
Ribs start going on over lower square sub-spar, after having been run-through with the large brass tube for lightening holes :
All ribs in, as well as new 12mm OD carbon tube spar, and upper square sub-spar :
Onwards!
No comments:
Post a Comment